The first floor frame has now started to go up. It is really good to see it taking shape - literally. Small hiccup with the WIR wall but our Site Manager assures us it will be sorted. The Windows arrived on site. However, when I tested their sound attenuation, they seem to be lacking. Probably need them to be installed with the walls in place for them to work properly eh? :-)
Anyway, forgot to take the proper camera so these snaps are from the iPhone:-
 |
This is the front of the house. |
 |
West elevation (left side of the house) |
Its all very exciting. Hoping the rest of the frame will finish tomorrow - we have rescheduled the pool dig (again) until after Australia day. Hope the rain holds off but the forecast is not great.