Steve has been anxiously sweeping the floorboards clear of excess water following each heavy rainfall. He is therefore very relieved that the roof tiles arrive last week. Despite some showers, Metricon have made good progress and the whole of the top floor is now roofed (is that a word??).
Steve has been slacking with the camera and I haven't got any piccies of the tiles themselves, but here is a nice photo of the roof from the inside.
Look - no daylight |
Steve spent 20 minutes this evening strolling around the site with his hands in his pockets looking skyward. (He really needs a hobby).
No comments:
Post a Comment